Proactive renewal of clarifier #4, needed to prepare for the new Activated Sludge Plant, was expected to increase loading to the ponds. Odour is now occurring from the ponds, and staff are still investigating the cause.
A small number of complaints have been received by both the council and ECan since the start of November, and odour is being detected at community odour monitoring stations. A council map shows areas of high, possible and low odour probability around the ponds.
Overall, 39 of 41 aerators are operational. Two 22 kW aerators on Pond 1 are out of service, leaving Pond 1 with 356 of 400 kW, while Ponds 2A and 2B have 262 kW and 260 kW respectively. A contractor is working to get the two aerators back into service; the fault is electrical and the timeframe is unknown.
Staff told the board the ponds are not overloaded but 'something is obviously going on'. Staff are continuing to monitor and balance flows between the ponds and will keep investigating the cause. The clarifier renewal is forecast to be finished in early December, when full temporary Activated Sludge Plant capacity will be restored.