The Electricity Authority has overhauled its Future Security and Resilience (FSR) roadmap, bringing forward major market and regulatory workstreams by three years to address operational risks associated with declining system inertia across the national transmission grid.
As synchronous thermal and hydro generation units are increasingly complemented or substituted by inverter-based resources (IBRs) including utility-scale solar, wind farms, and battery energy storage, the physical rotational kinetic energy that dampens rapid frequency fluctuations on the grid naturally decreases.
Following a minimum system inertia technical study commissioned from system operator Transpower in 2025, the Authority determined that Battery Energy Storage Systems (BESS) can provide rapid frequency response capable of stabilising grid frequency more swiftly than traditional spinning reserves.
To manage low-inertia conditions before acute operational vulnerabilities emerge, the Authority advanced Task 5.1—formulating a comprehensive frequency management strategy—by two years to run through FY27/28. Simultaneously, Tasks 5.2, 5.3, and 5.4 were brought forward by three years, establishing a parallel delivery programme from FY26/27 to FY28/29.
The accelerated work programme will formally incorporate a definition of system inertia into the Electricity Industry Participation Code, establish new reserve categories in the system operator's Procurement Plan, and modernize operational dispatch procedures, ensuring grid security while commercial battery installations continue to commission.