# Overseas Investment Office levies $20,000 retrospective penalty on Tasman Mining over Reefton residential leases for Snowy River mine village

> Australian-owned miner self-reports inadvertent statutory breach after acquiring residential leasehold interests exceeding three years, securing retrospective consent to develop a 2.5-hectare workforce village for the Snowy River Gold Mine.

- **Publication:** The Civic Record (Wellington, New Zealand)
- **Desk:** Investment, Banking & Land Consents
- **Kicker:** OVERSEAS INVESTMENT OFFICE · SENSITIVE LAND · RETROSPECTIVE PENALTY
- **Byline:** Toitū Te Whenua Land Information New Zealand — Overseas Investment Office
- **Published UTC:** 2026-11-02T00:00:00+13:00
- **Canonical URL:** https://civicrecord.nz/article/oio-tasman-mining-snowy-river-village-penalty-2026/

---

## Key Figures

- **Retrospective penalty levied:** $20,000 — Penalty imposed for acquiring leasehold interests without prior statutory consent
- **Freehold (1.49 ha) & leasehold (1.06 ha):** ~2.55 hectares — 1.4925 hectares freehold and 1.0567 hectares leasehold across Reefton
- **Beneficial ownership:** 87% Australia / 9% USA / 4% Swiss — Tasman Mining Limited, ultimately owned by Endura Mining Pty Ltd

The Overseas Investment Office has granted retrospective and prospective consent under section 12(1)(a) of the Overseas Investment Act 2005 to Tasman Mining Limited while imposing a $20,000 penalty for historical non-compliance in leasing residential land in Reefton.

Tasman Mining Limited, which is 87 percent Australian-owned and ultimately controlled by private entity Endura Mining Pty Ltd, is establishing a dedicated mining village to house workers supporting the Snowy River Gold Mine on the West Coast.

The investment encompasses a freehold interest in approximately 1.49 hectares situated across Buller Road, Potter Street, and Lucas Street in Reefton, acquired from Retail Solutions Limited, alongside an existing leasehold interest over 1.06 hectares on Hattie Street and Shiel Street.

The company filed a retrospective application after discovering that its residential lease terms exceeded the statutory three-year maximum threshold for sensitive residential land without prior regulatory authorization. Tasman Mining self-reported the breach to Land Information New Zealand upon discovery.

Regulators determined that the inadvertent nature of the violation warranted retrospective approval rather than civil enforcement proceedings, confirming that the applicant satisfied the investor test, incidental residential use test, and non-residential use criteria.

## Primary Sources

- **Toitū Te Whenua Land Information New Zealand — Overseas Investment Office** (26 Aug 2026): Overseas investment decision for case 202600406 - Tasman Mining Limited — [Original Document](https://www.linz.govt.nz/our-work/overseas-investment-regulation/decisions/2026-08/202600406)
