Wellington Water has disclosed that an infrastructure inspection in August 2026 discovered an active pipeline leak discharging wastewater directly into a stream along the coastal beach section of the Western Wastewater Treatment Plant outfall.
According to the facility's quarterly compliance report submitted to Greater Wellington Regional Council for the July to September period, an inspection on 18 August revealed that the Western Outfall pipeline was leaking into the stream on both sides of a corner joint, approximately 165 metres upstream from its coastal marine discharge point near the mouth of the Karori Stream. An earlier inspection on 16 July had similarly flagged damage or leakage, before a follow-up assessment on 2 September recorded no visible defects.
The disclosure coincides with formal regulatory action by Greater Wellington Regional Council, which issued an official Advisory Notice to Wellington Water on 13 October 2026 regarding technical non-compliance on the Western Outfall. The notice was prompted by extensive gaps in mandatory continuous flow recording under Condition 6 of resource consent WGN060283 [37892].
A severe storm on 27 June 2026 caused a facility power outage that disabled the Karori Effluent Pipeline flowmeter across two prolonged intervals: 1 to 16 July and 30 July to 2 August. Veolia acknowledged that efforts to backfill missing flow records from local SD card storage had been delayed due to technical resource shortages. When recorded, daily effluent discharges remained within the statutory limit of 200 litres per second and 17,280 cubic metres per day.